DataCenterSweden

Stockholm · Stockholm County · SE3

atNorth SWE01 Kista

Operational atNorth metro site in Kista. The operator page states 6,400 sqm facility size, 12 MW site power capacity, design PUE 1.2, liquid cooling and heat recovery with Stockholm Exergi.

OperationalGrid: Site power capacity is operator-stated at 12 MW. The underlying grid agreement is not published here.

Fact box

Actor
atNorth
Last checked
2026-09-10
Location accuracy
district · Approximate location

Approximate Kista district location.

Phases

  • SWE01Operational

Capacity disclosure

  • Site power

    12 MW

    ReportedAs of 2026-09-10 · atNorth

    12 MW Site power capacity

Planning and grid

Operating colocation hall. Permit file not reviewed in this launch set.

Site power capacity is operator-stated at 12 MW. The underlying grid agreement is not published here.

Updates

  • 2026-09-02

    atNorth says CPP Investments and Equinix completed an acquisition

    atNorth announced that CPP Investments and Equinix completed an acquisition and that atNorth would continue under its existing brand. This is an ownership event, not a capacity or construction change.

Knowledge gaps

  • Occupied IT load is not published.
  • Heat actually delivered versus recovery design is not quantified on the cited page.

Sources

  1. SWE01 Stockholm metro site atNorth, 2026-01-01. Checked 2026-09-10.
  2. Sweden data centers atNorth, 2026-01-01. Checked 2026-09-10.
  3. CPP Investments and Equinix complete atNorth acquisition atNorth, 2026-09-02. Checked 2026-09-10.

Submit a documented update · Report an error