Stockholm · Stockholm County · SE3
atNorth SWE01 Kista
Operational atNorth metro site in Kista. The operator page states 6,400 sqm facility size, 12 MW site power capacity, design PUE 1.2, liquid cooling and heat recovery with Stockholm Exergi.
Fact box
- Actor
- atNorth
- Status
- Operational
- Municipality / county
- Stockholm · Stockholm County
- Bidding zone
- SE3
- Site power
- 12 MW · atNorth
- Last checked
- 2026-10-20
- Location accuracy
- District
Phases
- SWE01 — Operational
Capacity disclosure
Site power
12 MW
Site power · current · 2026 · designed · campus
ReportedAs of 2026-09-10 · atNorth
“12 MW Site power capacity”
Planning and grid
Operating colocation hall. Permit file not reviewed in this launch set.
Site power capacity is operator-stated at 12 MW. The underlying grid agreement is not published here.
Updates
2026-09-02
atNorth says CPP Investments and Equinix completed an acquisition
atNorth announced that CPP Investments and Equinix completed an acquisition and that atNorth would continue under its existing brand. This is an ownership event, not a capacity or construction change.
Context
- County: Stockholm County
- Municipality: Stockholm
- Electricity area: SE3
- Actors: atNorth
More projects in Stockholm County
- atNorth SWE02 Akalla — In development
- Equinix SK1 — Operational
- Equinix SK2 — Operational
- Equinix SK3 — Operational
- Conapto Stockholm 3 North — Operational
Related news
- 2026-09-12 · atNorth’s 6 September 2023 SWE01 paper is a heat-recovery cooling design, not a 2026 megawatt-hour
- 2026-09-12 · atNorth announces SWE02 in Stockholm: 30 MW metro site, target go-live Q4 2027
- 2026-09-10 · atNorth reports completed acquisition by CPP Investments and Equinix
- 2026-09-10 · Stockholm heat reuse: Data Parks invitation versus delivered heat
- 2026-09-10 · Foreign investment screening reader: ISP literacy without nationality slogans
- 2026-09-10 · Grid-queue literacy: indicative, applied, reserved, allocated, energized
Knowledge gaps
- Occupied IT load is not published.
- Heat actually delivered versus recovery design is not quantified on the cited page.
Sources
- SWE01 Stockholm metro site — atNorth, 2026-01-01. Checked 2026-09-10.
- Sweden data centers — atNorth, 2026-01-01. Checked 2026-09-10.
- CPP Investments and Equinix complete atNorth acquisition — atNorth, 2026-09-02. Checked 2026-09-10.