STACK Infrastructure Stockholm campus STO01. The operator market page states 18 MW and one campus. The page does not define IT versus facility power.

OperationalGrid: 18 MW is operator-stated for the campus. Agreement documents are not published here.

Fact box

Last checked
2026-09-10
Location accuracy
municipality · Approximate location

Municipality-level pin. STACK’s page does not publish a district in the extract used here.

Phases

  • STO01Operational

Capacity disclosure

  • Announced capacity (definition unclear)

    18 MW

    ReportedAs of 2026-09-10 · STACK Infrastructure

    Operator market-page figure. Definition not stated.

    18 MW

Planning and grid

Operating campus. Permit file not reviewed here.

18 MW is operator-stated for the campus. Agreement documents are not published here.

Updates

No material changes in the launch set.

Knowledge gaps

  • Metric definition missing.
  • District / address not taken from a detailed campus sheet.

Sources

  1. STACK Infrastructure Stockholm STACK Infrastructure, 2026-01-01. Checked 2026-09-10.