Stockholm · Stockholm County · SE3
STACK STO01 Stockholm
STACK Infrastructure Stockholm campus STO01. The operator market page states 18 MW and one campus. The page does not define IT versus facility power.
OperationalGrid: 18 MW is operator-stated for the campus. Agreement documents are not published here.
Fact box
- Actor
- STACK Infrastructure
- Last checked
- 2026-09-10
- Location accuracy
- municipality · Approximate location
Municipality-level pin. STACK’s page does not publish a district in the extract used here.
Phases
- STO01 — Operational
Capacity disclosure
Announced capacity (definition unclear)
18 MW
ReportedAs of 2026-09-10 · STACK Infrastructure
Operator market-page figure. Definition not stated.
“18 MW”
Planning and grid
Operating campus. Permit file not reviewed here.
18 MW is operator-stated for the campus. Agreement documents are not published here.
Updates
No material changes in the launch set.
Knowledge gaps
- Metric definition missing.
- District / address not taken from a detailed campus sheet.
Sources
- STACK Infrastructure Stockholm — STACK Infrastructure, 2026-01-01. Checked 2026-09-10.