Södertälje · Stockholm County · SE3
Stendörren data centre, Södertälje (Almnäs)
Planned data centre of about 20,000 square metres GFA on Stendörren Fastigheter's property Almnäs 5:23 in the Stockholm Syd area of Södertälje, Stockholm County. The company reported a building permit for the data centre in summer 2026. On 17 November 2026 it said it had signed an agreement for 20 MW of electrical capacity, with the connection expected to be completed in the first half of 2028, and that it has identified a possibility to increase capacity to 40 MW over time. The company describes realising the property's value through future leasing or sale; no tenant, operator or investment decision is published.
Fact box
- Status
- In development
- Municipality / county
- Södertälje · Stockholm County
- Bidding zone
- SE3
- Utility power
- 20 MW · Stendörren Fastigheter / Cision
- Last checked
- 2026-11-17
- Location accuracy
- District
Phases
Capacity disclosure
Utility power
20 MW
Utility power · announced / planned · 2026 · contracted · building
ReportedAs of 2026-11-17 · Stendörren Fastigheter / Cision
The company's own wording. Electrical capacity under an agreement with an unnamed counterparty; not IT load. Connection expected in the first half of 2028.
“tecknat avtal om 20 megawatt (MW) elkapacitet”
Planning and grid
Building permit for a data centre of about 20,000 square metres GFA granted in summer 2026, according to the company. The municipal decision, its date and case number have not been reviewed here. No start notice is published.
According to the company (17 November 2026), an agreement for 20 MW of electrical capacity has been signed and the connection is expected to be completed in the first half of 2028. The counterparty is not named. The company has identified a possibility to increase capacity to 40 MW over time; no agreement for that is reported.
Updates
2026-11-17
Stendörren signs agreement for 20 MW of electrical capacity at Almnäs
Stendörren Fastigheter said it had signed an agreement for 20 MW of electrical capacity for its planned data centre on Almnäs 5:23 in Södertälje, with the connection expected in the first half of 2028. The counterparty is not named.
2026-07-21
Stendörren reports building permit for a data centre at Almnäs
In its interim report for January–June 2026, Stendörren Fastigheter said it had obtained a building permit for a data centre of about 20,000 square metres GFA at Almnäs in Södertälje.
Context
- County: Stockholm County
- Municipality: Södertälje
- Electricity area: SE3
- Actors: Stendörren Fastigheter
More projects in Stockholm County
- atNorth SWE01 Kista — Operational
- atNorth SWE02 Akalla — In development
- Equinix SK1 — Operational
- Equinix SK2 — Operational
- Equinix SK3 — Operational
Related news
Knowledge gaps
- The counterparty to the 20 MW agreement is not named, and it is not stated whether it is a connection agreement with the network owner.
- No tenant, operator, end customer or investment decision is published; the company mentions future leasing or sale.
- The municipal building-permit decision, its date and case number have not been reviewed here.
- What an increase from 20 MW to 40 MW would require, and when, is not stated.
Sources
- Stendörren Fastigheter press release: “Stendörren säkrar 20 MW elkapacitet för datacenteretablering – ökar potentialen för framtida värdeskapande i Stockholm Syd, Södertälje” (17 November 2026) — Stendörren Fastigheter / Cision, 2026-11-17. Checked 2026-11-17.
- Interim report January–June 2026 — Stendörren Fastigheter AB — Stendörren Fastigheter / Cision, 2026-07-21. Checked 2026-09-12.