Data centre, Ockelbo (Vallhalla, Lingbo)
Data centre on the property Vallhalla 1:125 (Fallåsvägen 51), about 2 kilometres west of Lingbo in Ockelbo municipality, Gävleborg County. The detailed plan for the Vallhalla industrial area, about 52 hectares, gained legal force on 9 July 2026. On 16 October 2026 Västra Gästriklands samhällsbyggnadsförvaltning granted a building permit for a data centre with offices, switchgear, a transformer station and other buildings (VGS-BYGG 2026-000365), and on 23 October a permit for a transformer station (VGS-BYGG 2026-000522). The permit notices do not name the applicant; the plan description says a plan agreement was signed with Hyperco Oy, Sverige filial.
Fact box
- Actor
- Status
- In development
- Municipality / county
- Ockelbo · Gävleborg County
- Last checked
- 2026-11-02
- Location accuracy
- District
Phases
Capacity disclosure
IT power
Not stated in the cited sources
IT power · current · 2026 · announced · campus
Unclear / conflictingAs of 2026-11-02 · Ockelbo kommun / Västra Gästriklands samhällsbyggnadsförvaltning
Planning and grid
Detailed plan VGS-PLAN 2024-000004 adopted by the municipal council and in legal force since 9 July 2026. Building permit for the data centre granted 16 October 2026 and posted on the notice board 19 October; transformer-station permit granted 23 October 2026. Per the municipality, decisions gain legal force when they have been published for 28 days. No start notice is published.
According to the plan description, Ellevio's Grönviken switching station north of the plan area is intended to supply it, and Ellevio is planning two new 145 kV overhead lines between Grönviken and Ockelbo. The municipality wrote in May 2024 that the site is in bidding area SE2. No capacity, connection agreement or connection date is published.
Updates
2026-10-16
Building permit granted for a data centre on Vallhalla 1:125 in Ockelbo
Västra Gästriklands samhällsbyggnadsförvaltning granted a building permit for a data centre, offices, guardhouse, water treatment plant, sprinkler facility, garage, switchgear, transformer station, wall and parking on Vallhalla 1:125 (Fallåsvägen 51), case VGS-BYGG 2026-000365. A separate transformer-station permit followed on 23 October (VGS-BYGG 2026-000522).
Context
- County: Gävleborg County
- Municipality: Ockelbo
More projects in Gävleborg County
- Microsoft Gävle — Operational
- Microsoft Sandviken — Operational
Related news
Knowledge gaps
- The permit notices do not name the applicant; the link to Hyperco comes from the plan documents.
- No power capacity, connection agreement or connection date is published.
- Investment and timetable are not given in primary sources; an operations start in November 2027 has only been reported by Kuxabladet as the company's plan.
- Whether the permits are appealed and when a start notice is issued is not known.
Sources
- Ockelbo municipality notice board: building permit granted for a data centre, offices, guardhouse, water treatment plant, sprinkler facility, garage, switchgear, transformer station, wall and parking on Vallhalla 1:125 (Fallåsvägen 51), case VGS-BYGG 2026-000365 (posted 19 October 2026) — Ockelbo kommun / Västra Gästriklands samhällsbyggnadsförvaltning, 2026-10-19. Checked 2026-11-02.
- Ockelbo municipality notice board: building permit granted for a transformer station on Vallhalla 1:125 (Fallåsvägen 51), case VGS-BYGG 2026-000522 (posted 23 October 2026) — Ockelbo kommun / Västra Gästriklands samhällsbyggnadsförvaltning, 2026-10-23. Checked 2026-11-02.
- Detailed development plan for the Vallhalla industrial area — Ockelbo kommun, 2026-07-09. Checked 2026-09-12.
- Detailed plan for the Vallhalla industrial area, Lingbo: plan description, adoption version (PDF, case VGS-PLAN 2024-000004, dated 27 April 2026) — Västra Gästriklands samhällsbyggnadsförvaltning, 2026-04-27. Checked 2026-11-02.
- Detailed plan for Vallhalla 1:125: property-consequence report (PDF, case VGS-PLAN 2024-000004, dated 28 November 2025) — Västra Gästriklands samhällsbyggnadsförvaltning, 2025-11-28. Checked 2026-11-02.
- Company examines a data-centre establishment in Lingbo — Ockelbo kommun, 2024-05-31. Checked 2026-09-12.
- Ockelbo municipality: Granted building permits (how decisions are published and when they gain legal force) — Ockelbo kommun / Västra Gästriklands samhällsbyggnadsförvaltning (publication date not stated). Checked 2026-11-02.
- Kuxabladet: Construction start delayed but Hyperco's plans stand – the data hall in Lingbo (17 September 2026) — Kuxabladet, 2026-09-17. Checked 2026-11-02.