STACK Infrastructure
Colocation operator of the published STO01 Stockholm campus.
The Stockholm market page states 18 MW and one campus. The page does not define whether 18 MW is IT load or facility load.
A profile is not a quality stamp.
Related projects
Sources
- STACK Infrastructure Stockholm — STACK Infrastructure, 2026-01-01. Checked 2026-09-10.