Editorial review 2026-09-10 · The editorial team · Jurisdiction: Sweden

Corrections log

Material corrections are listed here with a date, what changed and the affected URLs. Routine updates, where a fact changed in the world rather than in our reading of it, are shown on the project and in the update feed instead. Signed: the editorial team.

An industrial interior with equipment carts and overhead pipework.
An industrial interior with equipment carts and overhead pipework. Photo Lawrence Krowdeed on Unsplash

General orientation. Assess the specific project separately. Applies to: Anyone who needs to see who publishes DataCenterSweden and how facts are handled.

How to send a correction

Use the error form with a source and a date. The item enters a review queue. It is not published automatically.

  1. 2026-10-22 · The editorial team

    Seventeen guide pages said evroc’s 3 February 2025 Arlandastad release gave no megawatt figure. The release says the facility will feature 18 MW capacity, without defining whether that is IT load or grid connection. The guides now say so.

    /build/site-selection//power//power/electricity-costs//power/grid-capacity//power/grid-connection//power/time-to-power//power/grid-queue//sustainability//sustainability/heat-reuse//technology//technology/ai-hpc//technology/data-center-types//technology/ai-hpc/high-density-racks//technology/ai-hpc/training-vs-inference//technology/data-center-types/hyperscale-vs-enterprise-colo//market//methodology/sources-and-verification/

  2. 2026-10-21 · The editorial team

    The article on evroc’s Arlandastad land purchase and the grid queue guide said evroc’s 3 February 2025 release gave no megawatt figure. The release says the facility will feature 18 MW capacity, without defining whether that is IT load or grid connection, and that electricity supply is secured. Both texts now say so.

    /news/evroc-arlandastad-land-2025//news/grid-queue-literacy/

  3. 2026-10-21 · The editorial team

    The evroc Arlandastad profile and the Sigtuna and Stockholm county pages said evroc’s 3 February 2025 release gave no megawatt figure. The release’s headline points say the facility will feature 18 MW capacity, without defining whether that is IT load or grid connection. The profile now shows the 18 MW as an announced figure of unclear definition, and notes that the release says electricity supply is secured.

    /projects/evroc-arlandastad//locations/counties/stockholm//locations/municipalities/sigtuna/

  4. 2026-10-20 · The editorial team

    The Bahnhof Thule profile described the hall as being in the Lugnet district, as Bahnhof’s southernmost data center and as a fiber aggregation point. That description belongs to Bahnhof Sparven in Malmö. Thule is at Tunnelgatan 2 in central Stockholm, inside the Brunkebergsåsen ridge. The profile, its map position and the Stockholm municipality brief now say so, and Sparven has its own profile.

    /projects/bahnhof-thule//locations/municipalities/stockholm/

  5. 2026-10-17 · The editorial team

    The Scaleway AI cluster article said the company had not placed the Swedish AMD GPU cluster in Stockholm. A separate Scaleway announcement does place it in Stockholm. The paragraph now says so, and that the company has not said whether the cluster will sit in one of the three Availability Zones planned there for 2027.

    /news/scaleway-sweden-amd-ai-cluster-2026-10/