Falkenberg · Halland County · SE4

GleSYS Falkenberg

GleSYS west-coast data center. The current operator page states 5 MW total capacity, PUE 1.2, 100% renewable energy and district-heat recovery. A 1 October 2020 release said heat delivery to Falkenberg Energi had started and listed 3 MW utility power at completion.

OperationalGrid: Operator now states 5 MW total capacity. The 2020 release stated 3 MW utility power. The difference is unresolved in public wording.

Fact box

Actor
GleSYS
Status
Operational
Municipality / county
Falkenberg · Halland County
Bidding zone
SE4
Announced capacity (definition unclear)
5 MW · GleSYS
Last checked
2026-10-20
Location accuracy
Municipality level
Falkenberg100 km
Approximate Falkenberg location. 2020 release named Kanslistvägen 12.

Phases

  • Falkenberg hall — Operational

Capacity disclosure

  • Announced capacity (definition unclear)

    5 MW

    Announced capacity (definition unclear) · current · 2026 · announced · campus

    ReportedAs of 2026-09-10 · GleSYS

    “With a total capacity of 5 MW”

  • Utility power

    3 MW

    Utility power · historic · 2020 · announced · campus

    ReportedAs of 2020-10-01 · GleSYS / Mynewsdesk

    Historical utility-power figure from the 2020 heat-recovery release. Shown as a dated claim, not silently replaced by 5 MW.

    “Utility Power: 3 MW”

Planning and grid

Operating hall completed around 2020 according to the heat-recovery release.

Operator now states 5 MW total capacity. The 2020 release stated 3 MW utility power. The difference is unresolved in public wording.

Updates

  • 2020-10-01

    GleSYS says heat delivery to Falkenberg Energi has started

    A 1 October 2020 GleSYS release said surplus energy from the new Falkenberg hall had begun supplying district heat. That documents a start of delivery, not a later measured annual volume.

Context

Related news

Knowledge gaps

  • The operator page, read 20 October 2026, states “a total capacity of 5 MW” in its text but shows a “10 MW” counter elsewhere on the same page; the 5 MW row is kept until GleSYS clarifies.
  • Whether 5 MW superseded 3 MW through expansion is not explained on the cited pages.
  • Measured annual heat delivery after 2020 is not in those pages.

Sources

  1. GleSYS Falkenberg data center — GleSYS (publication date not stated). Checked 2026-10-20.
  2. Surplus energy from a new data center is transformed into district heating — GleSYS / Mynewsdesk, 2020-10-01. Checked 2026-09-10.

Submit a documented update · Report an error