Torsås · Kalmar County

SunSpark data centre, Torsås (Söderåkra)

Proposed data centre of about 10,000 square metres on the property Övraby 1:98 in Söderåkra, Torsås municipality, Kalmar County. On 24 March 2026 the municipal executive committee gave SunSpark Nordic AB a positive planning decision and told the head of building and environment to sign a plan-cost agreement (item 74, case 2026/000064). The site is 2.6 hectares of pasture. According to the minutes, the company wants to link the data centre with solar power and district heating. No power capacity is given.

ProposedGrid: No capacity, grid connection or connection date is given. The minutes say connection to district heating and municipal water and sewage at Pårydsvägen is possible.

Fact box

Actor
Status
Proposed
Municipality / county
Torsås · Kalmar County
Last checked
2026-10-27
Location accuracy
District
Torsås100 km
Pin placed at the village of Söderåkra in Torsås municipality (OpenStreetMap). The property is Övraby 1:98 by Pårydsvägen; the exact building position is not published.

Phases

    Capacity disclosure

    • IT power

      Not stated in the cited sources

      IT power · current · 2026 · announced · campus

      Unclear / conflictingAs of 2026-10-27 · Torsås kommun

    Planning and grid

    Positive planning decision by the municipal executive committee on 24 March 2026 (item 74, case 2026/000064); minutes posted 26 March to 17 April. The detailed plan is to be drawn up by a planning consultant at the applicant's expense. Five studies are named, including a siting study for farmland. On 7 September 2026 the municipality registered new site proposals from the company; they are not published.

    No capacity, grid connection or connection date is given. The minutes say connection to district heating and municipal water and sewage at Pårydsvägen is possible.

    Updates

    • 2026-03-24

      Torsås executive committee grants SunSpark a positive planning decision

      The municipal executive committee granted a positive planning decision for a data centre of about 10,000 square metres on Övraby 1:98 in Söderåkra and told the head of building and environment to sign a plan-cost agreement with SunSpark Nordic AB (item 74, case 2026/000064).

    Context

    More projects in Kalmar County

    Related news

    Knowledge gaps

    • No IT load, grid capacity or connection date is given in the municipal documents.
    • Investment size and timetable are not disclosed.
    • The September site proposals (4.5 and 15.2 hectares in their titles) are not published.
    • Whether a plan-cost agreement has been signed is not known.