DataCenterSweden

Editorial review 2026-09-10 · Jurisdiction: Sweden

Capacity definitions

Stored MW types are IT power, facility power, site power, utility power, and announced capacity with an unclear definition. Original wording is kept. A 41 MW Falun report figure, a 65 MW future campus sentence and an 80 MW “available power” page are three rows. They are not added together. Unknown is null, never zero.

General orientation. Assess the specific project separately. Applies to: Anyone who needs to see who publishes DataCenterSweden and how facts are handled.

Summing rules

National totals are therefore not published as a single exact MW number in this launch set.

  • Same metric type.
  • Same scope.
  • No phase plus its parent campus.
  • Show how many rows were excluded as unknown.

Sources

  1. EcoDC Holding AB annual report 2025 (English) EcoDC Holding AB, 2026-04-01. Checked 2026-09-10.
  2. SWE01 Stockholm metro site atNorth, 2026-01-01. Checked 2026-09-10.
  3. Conapto opens Stockholm 4 South Conapto / Mynewsdesk, 2024-09-05. Checked 2026-09-10.