Site DCS-807 · Västernorrland County
Zoned land for power-intensive industry at a railway hub
Compiled from public sources: the facts come from the municipality's or the landowner's own pages and plan documents. DataCenterSweden has no assignment from the owner and has not checked that the land is free.
Level 1 of 4: Designated
The municipality, landowner or network owner has designated the site. Neither plan nor power is confirmed.
- Region
- Västernorrland County
- Electricity area
- SE2
- Area
- 50–100 ha
- Stated power
- 100–200 MW
- Status
- Not confirmed with the owner
What is confirmed
The facts rest on public documents that DataCenterSweden has reviewed, most recently on 2026-11-16. The sources are shared together with the site file.
- Designated for the useMarketed by the regional investment agency for power-intensive industry, hydrogen and industrial symbiosis.Confirmed
- Detailed plan permitting the useDescribed as fully zoned and ready for permitting. We have not read the detailed plan.Partly
- Power commitment from the network ownerAccess to 200 MW of renewable electricity according to the regional investment agency. The network owner's statement has not been checked.Partly
- Land is availableThe owner is not stated in the public material.Unknown
- FibreUnknown
- Cooling water and waste heatThe site is intended for reuse of heat and by-products between operations.Partly
- Known constraints checkedUnknown