Site DCS-806 · Jämtland County
New industrial land by a European route in a draft comprehensive plan
Compiled from public sources: the facts come from the municipality's or the landowner's own pages and plan documents. DataCenterSweden has no assignment from the owner and has not checked that the land is free.
Level 1 of 4: Designated
The municipality, landowner or network owner has designated the site. Neither plan nor power is confirmed.
- Region
- Jämtland County
- Electricity area
- SE2
- Area
- 50–100 ha
- Stated power
- Not stated
- Status
- Not confirmed with the owner
What is confirmed
The facts rest on public documents that DataCenterSweden has reviewed, most recently on 2026-11-16. The sources are shared together with the site file.
- Designated for the useTwo areas totalling about 100 hectares are designated for industry according to local press. The comprehensive plan has been through consultation and review and exists in an adoption version from May 2026. We have not been able to confirm that it is adopted.Partly
- Detailed plan permitting the useNo detailed plan for the areas is known.No
- Power commitment from the network ownerUnknown
- Land is availableUnknown
- FibreUnknown
- Cooling water and waste heatUnknown
- Known constraints checkedUnknown
Get the file for DCS-806
The file is sent to your e-mail as a PDF. It contains the name of the place and a map of the location, the owner, plan status and provisions, power, known constraints, what we do not know and every source. A request does not reserve the land.
The sites are separate from the editorial project register. DataCenterSweden introduces interested parties to the landowner. Ownership and commercial relationships