Site DCS-801 · Norrbotten County
Industrial park by port and railway, ready to build according to the municipality
Compiled from public sources: the facts come from the municipality's or the landowner's own pages and plan documents. DataCenterSweden has no assignment from the owner and has not checked that the land is free.
Level 1 of 4: Designated
The municipality, landowner or network owner has designated the site. Neither plan nor power is confirmed.
- Region
- Norrbotten County
- Electricity area
- SE1
- Area
- 50–100 ha
- Stated power
- Not stated
- Status
- Not confirmed with the owner
What is confirmed
The facts rest on public documents that DataCenterSweden has reviewed, most recently on 2026-11-16. The sources are shared together with the site file.
- Designated for the useThe municipality markets the industrial park for new establishments.Confirmed
- Detailed plan permitting the useThe municipality states 75 hectares of zoned land, a maximum building height of 35 metres, and that zoning has started for a further 80 hectares. We have not read the plan documents.Partly
- Power commitment from the network ownerThe municipality states 40 MW of installed power in the area. There is no statement from the network owner on available capacity.Partly
- Land is availableThe municipality describes the land as immediately available. Which plots are free has not been checked.Partly
- FibreUnknown
- Cooling water and waste heatUnknown
- Known constraints checkedThe ground is peat and silty, sandy moraine according to the municipality. Water and wastewater are at the site boundary.Partly
Get the file for DCS-801
The file is sent to your e-mail as a PDF. It contains the name of the place and a map of the location, the owner, plan status and provisions, power, known constraints, what we do not know and every source. A request does not reserve the land.
The sites are separate from the editorial project register. DataCenterSweden introduces interested parties to the landowner. Ownership and commercial relationships