Swedish location research: first public evidence leads
These three examples show how public planning pages can support early location research. They were selected because relevant public documents could be identified, not because they are proven to be Sweden’s best or commercially available sites.

General orientation. Assess the specific project separately. Applies to: Initial desk research checked on 12 September 2026. We reviewed source pages and document inventories, not the complete planning files, contracts or engineering studies.
Hamre, Sollefteå: distinguish the project from the wider area
The municipality’s February 2026 announcement places atNorth in the area known as Hamre 1 and discusses work to attract further establishments. Its current planning page also lists the proposed extension of the Hamre industrial area. These are separate evidence threads that need matching to the correct boundaries.
A municipal notice dated 28 May 2026 reports E.ON’s connection agreement for atNorth in Långsele. That is evidence about a named project; it does not establish spare capacity for other properties.
- Research priority: establish which parcel and plan boundary a new enquiry would concern.
- Next checks: the latest planning decision, any remaining commercial availability and a separate network-owner response for the proposed load.
Sources for this section
- Sollefteå and atNorth prepare a development agreement for Hamre — Sollefteå kommun, 2026-02-05. Checked 2026-09-12.
- Current planning cases, including the Hamre industrial area extension — Sollefteå kommun (publication date not stated). Checked 2026-09-12.
- Municipal report of E.ON’s connection agreement for atNorth in Långsele — Sollefteå kommun, 2026-05-28. Checked 2026-09-12.
Kvarnsveden, Borlänge: a useful public document trail
Borlänge’s page for plan 673, part of Kvarnsveden 3:392, describes increased building rights within existing industrial land. At our check, the page described preparation for the review stage and listed consultation documents, including noise, stormwater, risk and land-contamination material.
- Research priority: review how an industrial redevelopment case addresses layout and surrounding constraints.
- Next checks: read the actual plan provisions and technical studies, confirm current process status, ownership and any opportunity for a new investor. The document list alone establishes none of these outcomes.
Sources for this section
- Plan 673: part of Kvarnsveden 3:392 — Borlänge kommun (publication date not stated). Checked 2026-09-12.
Boden: use the planning register to identify research areas
Boden’s planning register lists a second review for the Gruvbergsvägen–Häradsvägen area, covering Sävast 9:23 and other properties. The register describes additional business and industrial areas near Boden Industrial Park. This is a planning lead, not an identified data center offer.
- Research priority: identify the precise area and intended uses before investigating a data center scenario.
- Next checks: the latest plan documents, whether the proposed use can be assessed there, ownership, ground and access conditions, fibre and a site-specific power enquiry.
Sources for this section
- Boden’s detailed development plan register — Bodens kommun (publication date not stated). Checked 2026-09-12.
What can be concluded at this stage?
The pages provide starting points for three different investigations: project-versus-area boundaries in Hamre, an industrial redevelopment document trail in Kvarnsveden and an industrial planning lead in Boden. They do not support a ranking of investment attractiveness, a claim of available land or an estimate of connectable power.
The next useful comparison requires the same proposed workload, parcel-level information and current responses from the relevant parties. Use the screening guide to build that common evidence request.
Sources
- Sollefteå and atNorth prepare a development agreement for Hamre — Sollefteå kommun, 2026-02-05. Checked 2026-09-12.
- Current planning cases, including the Hamre industrial area extension — Sollefteå kommun (publication date not stated). Checked 2026-09-12.
- Municipal report of E.ON’s connection agreement for atNorth in Långsele — Sollefteå kommun, 2026-05-28. Checked 2026-09-12.
- Plan 673: part of Kvarnsveden 3:392 — Borlänge kommun (publication date not stated). Checked 2026-09-12.
- Boden’s detailed development plan register — Bodens kommun (publication date not stated). Checked 2026-09-12.